
Clarification of lower bounds of two-machine flow-shop scheduling to minimize total late work
Błażewicz, Jacek, Chen, Xin, Lee, Richard C. T., Lin, Bertrand M. T., Lin, Feng-Cheng, Pesch, Erwin, Sterna, Malgorzata, Wang, ZhongyuLangue:
english
Journal:
Engineering Optimization
DOI:
10.1080/0305215X.2018.1554066
Date:
December, 2018
Fichier:
PDF, 751 KB
english, 2018