
Hazard-based model for concrete pouring duration using construction site and supply chain parameters
Ghasri, Milad, Maghrebi, Mojtaba, Rashidi, Taha Hossein, Waller, S. TravisVolume:
71
Langue:
english
Journal:
Automation in Construction
DOI:
10.1016/j.autcon.2016.08.012
Date:
November, 2016
Fichier:
PDF, 1.19 MB
english, 2016