
PRESTRESSED PRECAST PILING AT DRAX POWER STATION AND THE USE OF PULVER ISED FUEL ASH REPLACEMENT IN CONCRETE.
WOOLLEY, GR, GAINS, JC, BALFE, P, BENAIM, R, MILLS, I, HANCOCK, CJ, CORISH, AT, KNIGHT, PGK, BROWN, M, DENNINGTON, DVolume:
78
Langue:
english
Journal:
Proceedings of the Institution of Civil Engineers
DOI:
10.1680/iicep.1985.1045
Date:
August, 1985
Fichier:
PDF, 389 KB
english, 1985