
[IEEE 2009 IEEE International Symposium on Assembly and Manufacturing (ISAM) - Seoul, South Korea (2009.11.17-2009.11.20)] 2009 IEEE International Symposium on Assembly and Manufacturing - A mathematical model for cyclic scheduling with assembly tasks and Work-In-Process minimization
Ben Amar, Mohamed Amin, Camus, Herve, Korbaa, OuajdiAnnée:
2009
Langue:
english
DOI:
10.1109/isam.2009.5376942
Fichier:
PDF, 2.71 MB
english, 2009